Write a scope of work contractors can price
A useful project brief lets two contractors price the same intended result. It does not need to prescribe a construction method you are not qualified to design. Describe the problem, the boundaries of the work, and the decisions that still need investigation.
Start with the result, not a product list
Write one sentence about what must change. For example: “Replace the damaged shower assembly, investigate the recurring water stain below it, and retain the toilet and vanity.” That separates a repair from a full bathroom remodel. Add how the room is used and any access needs that affect the result.
Photographs help explain location and condition. Date them and say what they show. Do not climb, remove electrical covers, or open a damaged assembly to make the brief more complete.
Mark the boundary
List the rooms or exterior areas included, the items that stay, and the surfaces that must be restored. “Replace the window” leaves open whether the frame, trim, paint, blinds, and surrounding wall are included. A boundary list makes those differences visible before bids arrive.
- Included: the work and restoration you expect the price to cover.
- Excluded: work deliberately left for another trade or a later project.
- Owner supplied: products you will buy, their model numbers, and who checks fit.
- Investigation required: conditions that cannot be confirmed before inspection or opening.
Keep unknowns separate from selections
An undecided tile is a selection. An uninspected subfloor is an unknown condition. Ask for an allowance for the selection and a written process for pricing concealed repairs. Do not treat both as an unexplained contingency in the contractor’s total.
For each allowance, record the amount, what it purchases, whether labor and tax are included, and how a change is approved. For an unknown condition, ask what evidence will be provided and whether a unit price or separate quote can be agreed.
Describe site constraints
Record working-hour limits, parking and equipment access, occupied rooms, utility shutdown constraints, pets, and protection of belongings. Name the bathroom, cooking space, or entrance that must remain usable. Ask the contractor to identify any constraint that prevents the proposed sequence.
Define completion evidence
Use checks you can observe and documents you can retain. Depending on the project, these may include product identification, operating demonstrations, finish walkthroughs, inspection closeout, photographs before concealment, and care instructions. Do not invent a technical test or a code requirement; ask the appropriate professional or authority what evidence applies.
Send one version to each bidder
Date the brief. When an inspection changes the proposed scope, update the brief and send the same revision to the other bidders. Ask each contractor to identify departures from it. Keep the final brief with the signed contract and every approved change.
The project planner creates a downloadable brief from your own inputs. It stores information in your browser and does not submit a request. Use the separate project-request form only when you choose to share contact information.
Sources and further reading