GENERAL CONTRACTING & ADDITIONS PROJECT QUESTIONS The first decision in a multi-trade project is who owns the coordination. A general contractor may manage design coordination, subcontractors, inspections, and sequencing, but only if the agreement actually assigns those responsibilities. DECISION Separate a defined repair list from a renovation requiring design and several trades. Ask whether each quote assumes completed drawings or includes the work needed to produce them. OBSERVATIONS Write down the rooms affected, the intended use, occupied areas, known defects, and the decisions you have not made. Identify the parts of the home that must remain usable. ACCESSORY DWELLING UNIT CONSTRUCTION Resolve local use and site requirements before detailed pricing. Compare utility connections, access, design, construction, inspections, and any separate address or occupancy process. AGING IN PLACE HOME MODIFICATION Start with daily tasks and routes that are becoming difficult. Ask about adaptable layouts, bathing and entry access, support locations, and staging work while the home remains occupied. CHILDPROOFING A HOME Review the home with the child's stage of development in mind. Compare anchoring, gates, accessible hazards, window safety, and supervision needs rather than buying one universal kit. HIRING A GENERAL CONTRACTOR Ask who supervises the site, coordinates trades, and approves changes. Compare the scope schedule, allowances, payment milestones, communication process, and closeout requirements in writing. HOME ADDITION CONSTRUCTION Develop a site and room brief before comparing builders. Ask who coordinates design, structure, weather protection, utilities, permits, and the connection to the existing home. HOME INSPECTION BEFORE BUYING Agree on the inspection scope, inaccessible areas, specialist exclusions, report format, and attendance. Ask which findings need a separate trade or structural assessment before closing. IN LAW SUITE ADDITION Define the intended occupancy and level of independence. Ask the local authority about use, kitchens, access, services, parking, and approvals before treating it as an ordinary room addition. SECOND STORY ADDITION Arrange assessment of the existing structure before design commitments. Ask about load paths, stairs, temporary weather protection, services, displacement, and sequencing with the designer and builder. SUNROOM ADDITION Compare seasonal use with conditioned living space. Ask how foundations, glazing, roof drainage, heating or cooling, and the existing wall opening change under each option. WHOLE HOME RENOVATION Break the work into systems and rooms, then identify dependencies. Ask whether phased occupancy is practical and who manages service shutdowns, protection, approvals, and unresolved design decisions. WHAT SHOULD I CHECK BEFORE REMODELING A FIREPLACE? Separate decorative work from changes to the firebox, flue, chimney, appliance, fuel supply, or clearances. Replacing a mantel is not necessarily harmless if the new material or projection affects required separation from heat. Identify the existing system and proposed appliance, and obtain the relevant installation instructions before selecting a surround or enclosing the opening. Ask a qualified fireplace or chimney professional what assessment is needed for the proposed change. Coordinate gas and electrical work with the appropriate trades and local approvals. For an older or unused fireplace, do not assume it is ready for use because the opening looks clean. The Chimney Safety Institute of America provides guidance on inspection and chimney hazards; the project professional should identify the applicable scope for your installation. The contract should identify assessment, demolition, appliance work, venting, support, hearth and surround construction, service connections, inspections, and finish restoration. Ask who checks the combined installation before use and who supplies operating and maintenance instructions. Agree how discoveries in the chimney or concealed structure affect the price. At handover, obtain the required records and a demonstration of safe operation. Keep the system out of use until the responsible professionals have resolved any safety restrictions, and maintain appropriate carbon monoxide protection under the relevant guidance. SUPPORTING GUIDANCE Chimney Safety Institute of America: homeowner inspection and safety resources: https://www.csia.org/homeowner-resources/ CPSC: carbon monoxide safety: https://www.cpsc.gov/safety-education/safety-guides/carbon-monoxide/carbon-monoxide-fact-sheet WHAT SHOULD I CONFIRM BEFORE HIRING A BUILDER FOR A HOUSE OR ADDITION? For a new house or addition, define the design and site responsibilities before asking builders for comparable construction prices. Identify the intended rooms and use, planning constraints, utilities, access, and the connection to existing construction. A preliminary concept can support an early budget discussion, but it leaves more assumptions than a coordinated set of drawings and selections. Ask who supplies the site investigation, structural and other design, permit applications, and coordination among professionals. For an addition, assess how the work affects foundations, roof drainage, exterior openings, utilities, and occupied areas. Record how temporary protection and access will work. Clarify whether the builder's price assumes particular ground conditions or excludes utility upgrades, drainage, landscaping, or work outside a footprint. The contract should identify the drawing revision and specification used, allowances, selection deadlines, schedule dependencies, payment triggers, change approval, and completion evidence. Request examples of comparable projects and check the actual contracting business's credentials. Agree how design changes and discoveries are priced before work proceeds. At handover, collect required approvals, equipment instructions, warranties, and unresolved-item records. The broad term turnkey should be replaced by an explicit list of included work so you can see which responsibilities remain with you. SUPPORTING GUIDANCE FTC: avoiding home improvement scams: https://consumer.ftc.gov/articles/how-avoid-home-improvement-scam DO I NEED A GENERAL CONTRACTOR, A SPECIALIST TRADE, OR A HANDYMAN? Choose the provider around the work and its local requirements. A small cosmetic repair may fit an appropriately qualified handyman. A defined plumbing, electrical, roofing, or other specialist task may need the relevant trade. A project that combines trades, design, permits, and sequencing may benefit from a general contractor responsible for coordinating the whole scope. Job size alone does not determine what credentials are required. Write down every task, including the interfaces between trades. A bathroom leak repair might require diagnosis, plumbing, waterproofing, enclosure work, and finish restoration. Ask which business owns each responsibility and who checks the sequence before work is concealed. A handyman's willingness to do everything is not evidence of authorization to perform regulated work. Check the actual requirements with the authority for the project address. For a general contractor, identify supervision, subcontractors, communication, scheduling, site protection, inspections, and change approval in the agreement. For separate trades, decide who performs those coordination tasks and include the time and responsibility in your comparison. Ask how a fault at an interface will be investigated rather than leaving each provider to refer you to another. The most useful choice is the arrangement that assigns all necessary work to qualified people with clear responsibility, not a provider selected only from a search label. SUPPORTING GUIDANCE FTC: avoiding home improvement scams: https://consumer.ftc.gov/articles/how-avoid-home-improvement-scam BID SCOPE Ask for a scope schedule by trade, allowances, exclusions, design responsibility, subcontractor coordination, permit handling, site supervision, change-order procedure, and milestone payments. COMPLETION Agree on a punch list, delivery of manuals and warranties, inspection closeout, and who will respond to defects. Keep a single record of drawings and written changes. https://contractorsfinder.com/handyman-and-general-contracting/ Revised 2026-11-24