What a roof replacement quote should include Two roof-replacement quotes can use the same shingle name and still promise different work. The important comparison is the complete installed assembly, the conditions each price assumes, and the responsibility for anything found after removal. Define the roof and removal scope Ask for the roof areas included and the basis of measurement. Identify attached porches, low-slope sections, additions, and outbuildings separately. Confirm whether the quoted amount includes removing existing layers and disposing of them, or retains any part of the old assembly. Check how the contractor will protect the building if weather interrupts work. Ask who handles temporary weather protection, daily cleanup, access, and damage to landscaping or exterior fixtures. Name the components rather than accepting “complete roof” The written specification should identify the covering, underlayment, starter and edge components, flashings, penetrations, and ventilation interfaces included. Product names help you check the relevant manufacturer's instructions and compare substitutions. | Bid item | Detail to request | | Covering | Exact product and specified installation system | | Underlying assembly | Underlayment and retained or replaced components | | Flashing | Locations, repair or replacement scope, and adjacent-trade exclusions | | Decking | Assessment limits, extra-work approval, and measurement or unit prices | | Roof openings | Vents, skylights, chimneys, and who owns their interfaces | | Closeout | Cleanup, inspection records where needed, and warranties | Resolve flashings and ventilation explicitly Do not assume that replacing the covering replaces every flashing or changes the attic ventilation design. Ask which existing parts remain, why that is appropriate, and how the new work connects to them. PNNL's asphalt-roof and penetration guidance provides background on these assembly relationships. If a contractor proposes a ventilation change, ask which condition it is intended to correct and what assessment supports it. Keep a roof replacement and an attic-system change identifiable in the scope. Price the unknowns without hiding them Ask how damaged decking or other concealed conditions will be documented and priced. Compare an allowance's meaning, not just its amount: what does it cover, how is work measured, and how is an unused allowance reconciled? Keep optional upgrades separate from necessary corrections. If one bidder includes an upgrade and another does not, obtain comparable alternatives before treating the price difference as a contractor markup. Connect payments to understandable milestones Read the proposed payment schedule, start assumptions, material arrangements, and change-order process. Contract and deposit requirements vary by location; consult the relevant local authority if a term is unclear. Do not accept an unwritten promise as a substitute for the scope attached to the agreement. Ask who supervises the site and who you contact during work. A named communication route helps when a concealed condition or unexpected interruption needs a decision. Agree on the handover before work begins Request photographs of concealed repairs where available, product identification, permit or inspection closeout where required, and separate material and workmanship warranties. Ask whether registration is required and who completes it. During the final walkthrough, compare the completed work with the actual bid items. Record unresolved issues and the agreed response. Keep that record with the contract instead of relying on the appearance of the new covering alone. SOURCES PNNL: asphalt-shingle roof assemblies: https://basc.pnnl.gov/resource-guides/asphalt-shingle-roofs PNNL: flashing penetrations in existing roofs: https://basc.pnnl.gov/resource-guides/flashing-penetrations-existing-roofs FTC: avoiding home improvement scams: https://consumer.ftc.gov/articles/how-avoid-home-improvement-scam https://contractorsfinder.com/roofing/how-to-hire-the-right-contractor-for-roof-replacement/ Published 2026-11-24